Yeoman Shield have recently supplied and installed wall and door protection in the new Urgent Care Unit at Halton Hospital Runcorn.

The unit will be busy catering for people in the Runcorn area and is hailed as a one stop shop offering an alternative to A&E for a range of minor injuries and urgent medical care.

“The new Urgent Care Unit has been adapted from the old Minor Injuries Unit which has under gone alteration and redecoration with new and refurbished doors fitted. We were keen to protect the new finishes from the damage which can be caused by the everyday use of a busy hospital department.” Said Lee Bushell, Building Surveyor at Warrington & Halton NHS Trust.

Yeoman Shield products were installed by their directly employed fixing team to the corridors and cubicle areas in the unit.

Guardian Handrail was fitted to protect the walls along the corridors and waiting areas in Aqua Blue with an attractive contrasting insert strip in Mid Grey. An Ultra 60 Protection Rail, also in Aqua Blue, was included at low level to protect the skirting and wall from damage which can be caused at this height from wheelchairs and trolleys.

Some of the doors in the unit required replacement and Yeoman Shield fire rated door protection panels and door edge protectors were fitted to all doors to protect from costly damage reoccurring. The addition of Yeoman Shield door protection helped to add uniformity of colour and style to the mixture of the new and old doors.

Aqua Blue FalmouthEx wall protection panels were installed along the cubicle area corridors and in the cubicles themselves protecting from damage which is caused by the movement of equipment and trolleys.

A Yeoman Shield Clapping Lath was applied to the double swing doors of the X-ray room. The lead lined clapping lath was fitted to the inside of the room doors to prevent any leaking of X-rays through the gap between the meeting edges of the door set.

“I am very pleased with the way that the Yeoman Shield products look and from past experience know that these products will help to keep the new unit looking smart for some time to come.” Concluded Mr Bushell.